系统工程V(SE-V)是指导复杂工程项目开发(INCOSE2011)的标准模型。通过生产设计和测试规范的一系列任务,SE-V涉及了分解和集成系统元素。本研究通过对运用新兴方式来进行系统结构和系统集成任务分析的应用多域映射(MDM)和设计结构矩阵(DSM)模型的应用,探讨了新的方法来提升SE-V的实现。在包括DSM组成部分,DSM集成任务和相应域映射矩阵(DMM)在内的离岸石油工业的大型工程项目的早期开发阶段,我们利用该方法和已收集的数据来说明我们的前期工作。我们以数据收集,汇总,可视化以及对解决系统集成挑战的潜在见解的方式讨论了研究发现。
The systems engineering V (SE-V) is the standard model to guide development of complex engineering projects (INCOSE 2011). The SE-V involves decomposition and integration of system elements through a sequence of tasks that produces both design and testing specifications. This paper explores a new method to improve SE-V implementation by applying multi-domain mapping (MDM) and design structure matrix (DSM) models in a novel way for analysis of both the system architecture and the system integration tasks. We illustrate our preliminary work using this method with data collected during the early development stage of a large engineering project in the offshore oil industry, including the component DSM, integration task DSM, and corresponding domain mapping matrix (DMM). We discuss findings in terms of data collection, aggregation, visualization, and potential insights for addressing system integration challenges.